Kelewatan tersebut memberikan risiko kepada Physical Hand Over (PHO) terawal LCS 1 yang dijadualkan pada 26 Ogos 2026 atau sasaran baharu pada 26 Dis 2026
In a bid to enhance naval combat readiness amid past delays, Mindef inks a LOA with MBDA France for surface-to-air missile systems to arm Malaysia’s Littoral Combat Ships
A nixed missile deal has triggered a billion-ringgit showdown between Putrajaya and a major Norwegian defense contractor, casting a shadow over the navy's premier littoral combat ship project just as sea trials finally show positive progress
Tindakan undang-undang diteruskan tanpa kompromi biarpun Oslo mohon maaf isu pembatalan lesen eksport NSM; Kuala Lumpur tuntut ganti rugi penuh susulan bayaran 95 peratus kontrak sudah dilunaskan
This allegedly involves cabin services, cargo and logistics, engineering and maintenance, as well as the commercial division, according to Scoop’s source