◉ HEADLINES

Malaysia Rail Link

Tambang ECRL belum dimuktamad, info tular hanya spekulasi

Malaysia Rail Link tegaskan kadar rasmi masih diperhalusi; rakyat diminta tunggu pengumuman sah Kementerian Pengangkutan

MRL takes swift flood mitigation action after Gombak locals claim ECRL site caused mud flood

Company rep says project passed all requirements, proactive steps taken with company providing aid and compensation to victims despite excessive rainfall, other construction sites there also contributing to the problem 

ECRL project owner denies claim trains can reach 351km/h

It is “inaccurate and misleading” to suggest that the East Coast Rail Link (ECRL) passenger train can reach speeds of up to 351km/h as it was never designed to be a high-speed train.

◉ Popular

National shuttlers demand RM2 million salaries: can BAM keep up financially?

Several top athletes aim for salaries that could outpace even the highest-earning footballers, raising questions about the sustainability of funding within Malaysian sports

Education Ministry scraps teacher training system to lighten workload

Minister Fadhlina Sidek vows to help teachers focus on what matters most – teaching – as new curriculum changes approach

What the pork!? – Rocky Bru

Rocky Bru reflects on a surprise in-flight warning about Malaysia’s pork import ban, tracing its public health roots and the politics of pig farming through a seasoned traveller’s lens